Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13625635

- Product Categories
- Friendly Links
Information Name: | Xi'an artificial turf | artificial turf | Qin Sports |
Published: | 2015-03-06 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Eighty-three group a football field in artificial turf renovation project started in the morning of October 11, a fifth division eighty-three regiment in artificial turf soccer field renovation project started. The stadium renovation was in 2014, one of ten things regiment, the transformation is expected to cost 3 million yuan. This construction project is the original natural turf soccer stadium transformed into artificial turf soccer field, the transformation of an area of ??7561.5 square meters. After a series of pre-bidding procedures eighty three groups identified the construction team, supervision company, currently all the preparation work has been completed. Also set up a special supervision team, to ensure project quality, supervise project progress, hope to soon completed and put into use. The above is for reference only, please contact us for details, click or visit the official website to know. Note first artificial turf renovation, refurbishment means to remove the old and replace new. So the first step is removed, which is a key element. The removal process first thing to note is not to destroy the original foundation. Second, pay attention to clean up the old sod removal, quartz sand, rubber granules Xianyang lawns, old these materials are definitely not use artificial turf supplier, after many years of using the old long lost these materials its inherent properties, which mixed with a lot of dust and other junk dirt. Third, the removal of these waste materials are down tons of units, so the quote process to fully consider the site to see a lot of novice, look at the site have been close to bald lawn artificial turf, they thought need to clean up the rubbish removal will be less, in fact, not the case. Fourth, the new artificial turf before the pavement Xi'an artificial turf, be sure to clean up the site, the best conditions rinse again, clean space above the surface dust dust, and then start the pavement. The above is for reference only, please contact us for details, click or visit the official website to know. Xi'an artificial turf | artificial turf | Qin sports facilities provided by the West 安秦氏 Sports Limited. West 安秦氏 Sports Facilities Co. (www.xaqs6688.com) (www.xaqsty.com) strong, credible, in Xi'an plastic flooring industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving Qin innovative ideas will lead into the brilliant sports and you work for a better future! You can also access (www.xaqsty.com/supply_details_48071435.html), for more information about the company. |
Admin>>>
You are the 33391 visitor
Copyright © GuangDong ICP No. 10089450, West Anqin Shi Sports Facilities Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 33391 visitor
Copyright © GuangDong ICP No. 10089450, West Anqin Shi Sports Facilities Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility